Skip to main content

Support sought for 'no more ducking'

Work has started on studying the county Highway HHH bridge replacement over Shawano Creek (The Channel) as an Intertek PSI crew collected soil samples on Wednesday. The bridge, built in 1951, is scheduled for replacement in 2022. Grant Bystol, Shawano County highway commissioner, explained at an Oct. 9 public meeting that a new rule from the state Department of Transportation requires bridges to be “replaced in kind,” meaning a replacement is constructed to current standards but without upgrades. For the HHH bridge, this means that the road would be widened to the 44-foot wide current standard but retain the existing bridge’s 5.6-foot height above water level. Residents have been asked to show their support via a survey on p. 23 of the Oct. 30 Shawano Leader print edition for “Concept 2,” a higher structure than the current span. Gary Defere, SAWM president, said his board and its members support the higher and wider version and wanted to encourage additional public backing. “If you’re going to spend the money, why not make it higher and wider,” Defere said, referring to the present height, requiring boaters to lower canopies and duck. Concept 2 would widen the bridge span and bring the height to 6.9 feet. This is roughly the same bridge structure that is over the channel on North Main Street (state Highway 47-55), Keith Behrend from Strand Associates, an engineering design and consulting firm, said. Cost estimates for either option were not available, but Behrend acknowledged that the higher, wider bridge would be 150% to 200% the cost of simple replacement. Bystol said the county has agreed to cover the 20% cost of either option. “If we do not have public support, we will be stuck with the ‘replace in kind’ option,” Bystol said. Residents and visitors are invited to submit comments about the bridge. Comments, and requests for electronic files with the bridge design options, can be sent to keith.behrend@strand.com.