A survey conducted by the Clintonville School District shows more residents support building a new elementary school than remodeling the current Rexford-Longfellow Elementary School.
“You’re on the bubble for a new building,” said Bill Foster, a consultant with School Perceptions, which conducted the survey for the district.
The results, he told the school board Monday, were “good enough to run a referendum.”
Foster said 1,058 surveys, a response rate of about 21 percent, were turned in. The largest number of responses came from families with children attending the high school. Residents 65 and older accounted for 26 percent of the responses. School district employees accounted for 20 percent of the responses.
When asked if they would support a $19.6 million to $23.7 million referendum to renovate Rexford-Longfellow Elementary, 37 percent of the survey respondents said no; 36 percent said yes.
When asked if they would support a $24.9 million referendum to build a new school on the existing Rexford-Longfellow site, the vote was 50 percent yes and 33 percent no.
There were substantial numbers of people undecided or wanting more information about both questions, Foster said.
Rexford School was built in 1956. The two-story Longfellow addition was built in 1964. A cafeteria and classrooms were added in 1992, and office space was added in 1996. The complex is connected to the building constructed in 1918 as a high school.
In the survey, taxpayers are asked if they want to maintain the 1918 structure, maintain and update Rexford-Longfellow, replace the complex at the existing site, or do nothing.
There is a group that wants to keep the 1918 high school and there is another group that definitely wants to tear it down, Foster noted.
Foster suggested that it was now up to the district’s task force studying the issue to come up with a recommendation and submit it to the board for consideration.
District officials say the 1918 section of the complex needs tuck pointing, the windows and doors need to be repaired or replaced, a portion of the roof needs to be replaced, the heating system is aging and parts of the building do not meet Americans with Disabilities Act standards.
The Rexford-Longfellow building infrastructure does not support current technology, according to a facilities assessment done by Bray Architects. The building is larger than what is needed to serve the current and projected student enrollment and is more expensive to heat and operate due to age.
The task force studying the elementary school issue voted to support moving the 4K program from the Dellwood Early Learning Center to Rexford-Longfellow, which would serve students in 4-year-old kindergarten through fourth grade. The learning center would then close, which would be one less building for the district to maintain.
The task force narrowed the list of Rexford-Longfellow options to three:
• Renovate the school and maintain the 1918 portion of the school. This would include renovating the interior of the 1918 building and largely preserving the exterior. The 1956 and 1992 buildings and a small portion of the 1964 building would be demolished and the remaining school renovated.
• Renovate the school and demolish the 1918 portion.
• Demolish the existing structure and build a new school on the Rexford-Longfellow site.
Under the renovation options, taxes are estimated to increase no more than $93 per year, for a property valued at $100,000, for the first five years and decline thereafter, according to the school district.
If the district would decide to build a new school, taxes are estimated to increase no more than $98 per year for the first five years and decline thereafter, according to the school district.
In 2022, the district will make the final payment on the debt issued to build the high school and recreation center.